IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

529

matching recommendations
Reset
NAICS 31111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0180 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $425 $815 Not Implemented
UU0180 # 09 Y:2021 09 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $323 $227 Implemented
UF0560 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $41,999 $359,360 Not Implemented
UF0560 # 02 Y:2020 02 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,454 $5,998 Implemented
UF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $3,072 $8,274 Not Implemented
UF0560 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,897 $1,544 Implemented
UF0560 # 05 Y:2020 05 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,841 $378 Implemented
UF0560 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,156 $306 Implemented
UF0560 # 07 Y:2020 07 2020 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $134,615 $11,004 Not Implemented
UF0560 # 08 Y:2020 08 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $9,639 $725 Implemented
OK1021 # 01 Y:2019 01 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $957 $524 Implemented
OK1021 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $4,312 Implemented
OK1021 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $850 Implemented
OK1021 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $6,865 $426 Implemented
OK1021 # 05 Y:2019 05 2019 INSTALL SUB-METERING EQUIPMENT $5,665 $887 Not Implemented
NL0021 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,355 $0 Implemented
NL0021 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,774 $15,206 Implemented
NL0021 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
AM0753 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,122 $4,000 Not Implemented
AM0753 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,100 $0 Not Implemented
AM0753 # 03 Y:2018 03 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,100 $0 Not Implemented
AM0753 # 04 Y:2018 04 2018 METER WASTE WATER $6,905 $2,650 Not Implemented
AM0753 # 05 Y:2018 05 2018 OPTIMIZE PLANT POWER FACTOR $5,666 $14,090 Not Implemented
AM0753 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,750 $0 Not Implemented
AM0753 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,377 $5,228 Implemented