Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
537
matching recommendationsNAICS | 31111 | Animal Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1047 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,181 | $17,737 | Implemented |
UU0180 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $12,454 | $25,000 | Not Implemented |
UU0180 # 02 Y:2021 | 02 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,938 | $33,750 | Not Implemented |
UU0180 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,182 | $4,000 | Implemented |
UU0180 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,073 | $13,873 | Implemented |
UU0180 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,445 | $6,445 | Not Implemented |
UU0180 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $126 | Implemented |
UU0180 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $503 | $503 | Not Implemented |
UU0180 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $425 | $815 | Not Implemented |
UU0180 # 09 Y:2021 | 09 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $323 | $227 | Implemented |
UF0560 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,999 | $359,360 | Not Implemented |
UF0560 # 02 Y:2020 | 02 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,454 | $5,998 | Implemented |
UF0560 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $3,072 | $8,274 | Not Implemented |
UF0560 # 04 Y:2020 | 04 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,897 | $1,544 | Implemented |
UF0560 # 05 Y:2020 | 05 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,841 | $378 | Implemented |
UF0560 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,156 | $306 | Implemented |
UF0560 # 07 Y:2020 | 07 | 2020 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $134,615 | $11,004 | Not Implemented |
UF0560 # 08 Y:2020 | 08 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,639 | $725 | Implemented |
OK1021 # 01 Y:2019 | 01 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $957 | $524 | Implemented |
OK1021 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,490 | $4,312 | Implemented |
OK1021 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $850 | Implemented |
OK1021 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,865 | $426 | Implemented |
OK1021 # 05 Y:2019 | 05 | 2019 | INSTALL SUB-METERING EQUIPMENT | $5,665 | $887 | Not Implemented |
NL0021 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,355 | $0 | Implemented |
NL0021 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,774 | $15,206 | Implemented |