IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

638

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0618 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $977 $1,975 Not Implemented
OR0618 # 04 Y:2013 04 2013 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $9,796 $50,179 Not Implemented
OR0618 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,187 $2,283 Not Implemented
SF0428 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $584 $329 Not Implemented
SF0428 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,060 $57,544 Not Implemented
SF0428 # 14 Y:2013 14 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,775 $25,138 Not Implemented
SF0428 # 13 Y:2013 13 2013 ISOLATE HOT OR COLD EQUIPMENT $2,222 $6,975 Not Implemented
SF0428 # 12 Y:2013 12 2013 INSTALL OCCUPANCY SENSORS $15,352 $26,883 Not Implemented
SF0428 # 11 Y:2013 11 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,652 $9,933 Not Implemented
SF0428 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,972 $12,679 Implemented
SF0428 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,709 $11,701 Not Implemented
SF0428 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $542 $421 Not Implemented
SF0428 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $1,669 $1,332 Implemented
SF0428 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,782 $19,063 Not Implemented
SF0428 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,736 $1,751 Implemented
SF0428 # 03 Y:2013 03 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $13,990 $3,780 Not Implemented
SF0428 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,121 $0 Implemented
SF0428 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,313 $0 Implemented
UA3019 # 01 Y:2012 01 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $187,856 $297,985 Not Implemented
UA3019 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,559 $12,491 Not Implemented
UA3019 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,076 $11,695 Implemented
UA3019 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,814 $800 Implemented
UA3019 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $10,114 $16,643 Implemented
UA3019 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $31,634 $18,198 Not Implemented
UA3019 # 07 Y:2012 07 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $11,310 $10,991 Not Implemented