IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0023 # 03 Y:2023 03 2023 REPLACE BOILER $13,894 $30,000 n/a
CI0023 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $78,738 $658,288 n/a
CI0023 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $45,480 $17,533 n/a
CI0023 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,881 $2,299 n/a
CI0023 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,902 $300 n/a
CI0023 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,797 $5,000 n/a
CI0023 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,670 $7,500 n/a
CI0023 # 09 Y:2023 09 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $13,000 n/a
CI0023 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $7,791 $2,625 n/a
SD0607 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,809 $38,800 Not Implemented
SD0607 # 08 Y:2021 08 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $487 $540 Not Implemented
SD0607 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $706 Not Implemented
SD0607 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $760 Not Implemented
SD0607 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,289 $2,741 Not Implemented
SD0607 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,753 $568 Not Implemented
SD0607 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $2,100 Not Implemented
SD0607 # 01 Y:2021 01 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $26,888 $500 Not Implemented
SF0532 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $2,757 Implemented
SF0532 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,844 $20,718 Implemented
SF0532 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $879 $0 Implemented
SF0532 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $1,777 $4,972 Not Implemented
SF0532 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $2,762 $4,681 Not Implemented
SF0532 # 07 Y:2019 07 2019 REPLACE BOILER $20,414 $108,576 Implemented
SF0532 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,025 $8,491 Implemented
SF0530 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,808 $97,552 Implemented