Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0618 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,187 $2,283 Not Implemented
OR0618 # 04 Y:2013 04 2013 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $9,796 $50,179 Not Implemented
OR0618 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $977 $1,975 Not Implemented
OR0618 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $10,380 $800 Not Implemented
OR0618 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,881 $3,300 Not Implemented
OR0474 # 02 Y:2004 02 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $9,900 $2,770 Implemented
OR0474 # 06 Y:2004 06 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,200 $1,500 Not Implemented
OR0474 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $3,000 Implemented
OR0474 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,700 $5,900 Implemented
OR0474 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,700 $2,030 Implemented
OR0474 # 01 Y:2004 01 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $8,887 $4,500 Implemented
OR0428 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,901 $7,500 Not Implemented
OR0428 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $0 Implemented
OR0428 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $26 Implemented
OR0428 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $500 Implemented
OR0428 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $742 $1,320 Not Implemented
OR0428 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $688 $2,800 Not Implemented
OR0428 # 07 Y:2003 07 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $400 $1,970 Implemented