IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0777 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,570 $0 Implemented
OR0777 # 02 Y:2023 02 2023 INSTALL COMMON HEADER ON COMPRESSORS $2,832 $6,989 Implemented
OR0777 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,479 $0 Implemented
OR0629 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $58,681 $3,764 Implemented
OR0629 # 02 Y:2014 02 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,863 $38,930 Not Implemented
OR0629 # 01 Y:2014 01 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $37,907 $21,000 Implemented
OR0629 # 04 Y:2014 04 2014 REPLACE BOILER $523,306 $3,403,664 Implemented
UW0023 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $7,267 $200,000 Implemented
UW0023 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,120 $60,200 Not Implemented
UW0023 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,974 $120,000 Implemented
UW0023 # 04 Y:2009 04 2009 CONTROL PRESSURE ON STEAMER OPERATIONS $6,132 $0 Not Implemented
UW0023 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,851 $2,500 Implemented
OR0494 # 10 Y:2005 10 2005 UPGRADE CONTROLS ON COMPRESSORS $3,500 $2,320 Not Implemented
OR0494 # 15 Y:2005 15 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,580 $19,700 Not Implemented
OR0494 # 14 Y:2005 14 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $107,700 $340,000 Implemented
OR0494 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,800 $49,400 Implemented
OR0494 # 12 Y:2005 12 2005 UPGRADE OBSOLETE EQUIPMENT $1,100 $1,300 Not Implemented
OR0494 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,400 $6,500 Implemented
OR0494 # 02 Y:2005 02 2005 REDUCE FLUID FLOW RATES $63,500 $0 Implemented
OR0494 # 09 Y:2005 09 2005 REDUCE FLUID FLOW RATES $2,400 $0 Implemented
OR0494 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $77,000 $0 Not Implemented
OR0494 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,400 $0 Implemented
OR0494 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $0 Implemented
OR0494 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $55,000 $3,100 Implemented
OR0494 # 04 Y:2005 04 2005 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $36,800 $1,400 Not Implemented