IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
NAICS 31122 Starch and Vegetable Fats and Oils Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0087 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,313 $7,280 Implemented
SF0501 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,074 $1,769 Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented
LE0411 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $21,409 $9,106 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0411 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $16,912 Implemented
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
IP0053 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $57,305 $915 Implemented
IP0053 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $924 Implemented
IP0053 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,650 $2,685 Implemented
IP0053 # 03 Y:2015 03 2015 APPLY FOR INVESTMENT INCENTIVES $38,029 $5,000 Implemented
IP0053 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,294 $160 Implemented
IA0534 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,201 $9,836 Implemented
IA0534 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,029 $542 Implemented
IA0534 # 04 Y:2015 04 2015 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $590 $2,620 Implemented
IA0534 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $269 Implemented
IA0534 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $338 $1,008 Implemented
UA3019 # 08 Y:2012 08 2012 INSULATE BARE EQUIPMENT $2,412 $1,248 Implemented
UA3019 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $10,114 $16,643 Implemented
UA3019 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,814 $800 Implemented
UA3019 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,076 $11,695 Implemented