IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 3113 Sugar and Confectionery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SF0572 # 10 Y:2021 10 2021 INSTALL SUB-METERING EQUIPMENT $8,446 $6,896 Implemented
SF0572 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,781 $1,200 Implemented
SF0572 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,373 $200 Implemented
SF0541 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,140 $26,538 Implemented
SF0541 # 09 Y:2019 09 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $36,428 $115,019 Implemented
SF0541 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $2,727 $8,304 Implemented
SF0541 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,815 $1,514 Implemented
SF0541 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,964 $5,000 Implemented
SF0541 # 04 Y:2019 04 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $1,697 $1,327 Implemented
SF0541 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,931 $15,969 Implemented
SF0541 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $7,042 $7,678 Implemented
SF0541 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $261 $578 Implemented
SF0541 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,599 $153,278 Implemented
SF0429 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $9,736 $36,817 Implemented
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SF0429 # 02 Y:2013 02 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $578 $810 Implemented
SF0406 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,567 $3,773 Implemented
SF0406 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,483 $0 Implemented
SF0406 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,385 $0 Implemented
SF0406 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,401 $0 Implemented
SF0385 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $5,266 $5,951 Implemented
SF0385 # 14 Y:2010 14 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,082 $12,770 Implemented
SF0385 # 16 Y:2010 16 2010 OPTIMIZE PLANT POWER FACTOR $9,677 $23,715 Implemented