Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
409
matching recommendationsNAICS | 3113 | Sugar and Confectionery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0462 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,934 | $15,779 | Implemented |
WV0462 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,970 | $1,530 | Implemented |
WV0462 # 10 Y:2013 | 10 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $7,809 | $8,200 | Implemented |
WV0462 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,390 | $7,119 | Implemented |
WV0462 # 12 Y:2013 | 12 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $476 | $604 | Not Implemented |
SF0406 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,385 | $0 | Implemented |
SF0406 # 02 Y:2012 | 02 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,401 | $0 | Implemented |
SF0406 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,483 | $0 | Implemented |
SF0406 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,629 | $818 | Not Implemented |
SF0406 # 05 Y:2012 | 05 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,567 | $3,773 | Implemented |
SF0406 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,352 | $1,460 | Not Implemented |
SF0406 # 07 Y:2012 | 07 | 2012 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $90,076 | $288,023 | Not Implemented |
SF0406 # 08 Y:2012 | 08 | 2012 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $25,304 | $93,999 | Not Implemented |
SF0406 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,696 | $10,439 | Not Implemented |
SF0406 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $4,954 | $21,408 | Not Implemented |
IC0191 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,161 | $109,685 | n/a |
IC0191 # 02 Y:2011 | 02 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,804 | $57,885 | n/a |
IC0191 # 03 Y:2011 | 03 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,379 | $0 | n/a |
IC0191 # 04 Y:2011 | 04 | 2011 | INSULATE BARE EQUIPMENT | $6,711 | $2,345 | n/a |
IC0191 # 05 Y:2011 | 05 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $190 | $150 | n/a |
IC0191 # 06 Y:2011 | 06 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $714 | $200 | n/a |
IC0191 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $893 | $0 | n/a |
IC0191 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,189 | $690 | n/a |
SF0394 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,204 | $73 | Implemented |
SF0394 # 02 Y:2011 | 02 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $439 | $235 | Implemented |