Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 3113 | Sugar and Confectionery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0019 # 08 Y:2013 | 08 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $25 | Not Implemented |
BS0019 # 07 Y:2013 | 07 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $23 | $25 | Implemented |
BS0019 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $165 | $120 | Implemented |
BS0019 # 10 Y:2013 | 10 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $142 | $551 | Implemented |
BS0019 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $187 | $364 | Not Implemented |
BS0019 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $84 | $157 | Not Implemented |
BS0019 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $41 | $81 | Implemented |
BS0019 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $47 | $36 | Implemented |
BS0019 # 06 Y:2013 | 06 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $349 | Implemented |
BS0019 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $349 | Implemented |
UM0427 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,680 | $9,000 | Implemented |
UM0427 # 06 Y:2013 | 06 | 2013 | INSTALL EFFICIENT RECTIFIERS | $20,863 | $12,000 | Not Implemented |
UM0427 # 05 Y:2013 | 05 | 2013 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $196,098 | $500,000 | Not Implemented |
UM0427 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,906 | $6,500 | Implemented |
UM0427 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,140 | $5,000 | Not Implemented |
UM0427 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,442 | $10,650 | Not Implemented |
SF0429 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $18,109 | $0 | Not Implemented |
SF0429 # 02 Y:2013 | 02 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $578 | $810 | Implemented |
SF0429 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,006 | $16,020 | Not Implemented |
SF0429 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $14,210 | $38,634 | Not Implemented |
SF0429 # 05 Y:2013 | 05 | 2013 | USE COMPRESSOR AIR FILTERS | $9,736 | $36,817 | Implemented |
SF0429 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $919 | $5,601 | Implemented |
SF0429 # 07 Y:2013 | 07 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,991 | $0 | Not Implemented |
SF0429 # 08 Y:2013 | 08 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $228,512 | $0 | Not Implemented |
DL0101 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,800 | $0 | Not Implemented |