Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 311351 | Chocolate and Confectionery Manufacturing from Cacao Beans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0572 # 10 Y:2021 | 10 | 2021 | INSTALL SUB-METERING EQUIPMENT | $8,446 | $6,896 | Implemented |
SF0572 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,781 | $1,200 | Implemented |
SF0572 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,373 | $200 | Implemented |
SF0385 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,418 | $0 | Implemented |
SF0385 # 18 Y:2010 | 18 | 2010 | USE OPTIMUM THICKNESS INSULATION | $36,228 | $325,369 | Implemented |
SF0385 # 16 Y:2010 | 16 | 2010 | OPTIMIZE PLANT POWER FACTOR | $9,677 | $23,715 | Implemented |
SF0385 # 14 Y:2010 | 14 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,082 | $12,770 | Implemented |
SF0385 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $5,266 | $5,951 | Implemented |
SF0385 # 09 Y:2010 | 09 | 2010 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $640 | $633 | Implemented |
SF0385 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $1,608 | $750 | Implemented |
SF0385 # 06 Y:2010 | 06 | 2010 | USE PHOTOCELL CONTROLS | $14,856 | $6,800 | Implemented |
SF0385 # 03 Y:2010 | 03 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,195 | $1,760 | Implemented |
SF0385 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,270 | $0 | Implemented |
SF0382 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,423 | $62,855 | Implemented |
SF0382 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $733 | $2,953 | Implemented |
SF0382 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $12,608 | $36,493 | Implemented |
SF0382 # 05 Y:2010 | 05 | 2010 | USE PHOTOCELL CONTROLS | $4,141 | $6,637 | Implemented |
SF0382 # 04 Y:2010 | 04 | 2010 | INSULATE BARE EQUIPMENT | $53,897 | $49,178 | Implemented |
SF0382 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,775 | $7,837 | Implemented |
SF0382 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $9,146 | $2,700 | Implemented |
SF0330 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $0 | Implemented |
SF0282 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,198 | $0 | Implemented |
SF0282 # 10 Y:2004 | 10 | 2004 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $34,944 | $72 | Implemented |
SF0282 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $442 | $1,200 | Implemented |
SF0282 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,053 | $2,417 | Implemented |