IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 311351 Chocolate and Confectionery Manufacturing from Cacao Beans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0572 # 10 Y:2021 10 2021 INSTALL SUB-METERING EQUIPMENT $8,446 $6,896 Implemented
SF0572 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,781 $1,200 Implemented
SF0572 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,373 $200 Implemented
SF0385 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,418 $0 Implemented
SF0385 # 18 Y:2010 18 2010 USE OPTIMUM THICKNESS INSULATION $36,228 $325,369 Implemented
SF0385 # 16 Y:2010 16 2010 OPTIMIZE PLANT POWER FACTOR $9,677 $23,715 Implemented
SF0385 # 14 Y:2010 14 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,082 $12,770 Implemented
SF0385 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $5,266 $5,951 Implemented
SF0385 # 09 Y:2010 09 2010 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $640 $633 Implemented
SF0385 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,608 $750 Implemented
SF0385 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $14,856 $6,800 Implemented
SF0385 # 03 Y:2010 03 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,195 $1,760 Implemented
SF0385 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,270 $0 Implemented
SF0382 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,423 $62,855 Implemented
SF0382 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $733 $2,953 Implemented
SF0382 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $12,608 $36,493 Implemented
SF0382 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $4,141 $6,637 Implemented
SF0382 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $53,897 $49,178 Implemented
SF0382 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,775 $7,837 Implemented
SF0382 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $9,146 $2,700 Implemented
SF0330 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $0 Implemented
SF0282 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,198 $0 Implemented
SF0282 # 10 Y:2004 10 2004 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $34,944 $72 Implemented
SF0282 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $442 $1,200 Implemented
SF0282 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,053 $2,417 Implemented