Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsNAICS | 311352 | Confectionery Manufacturing from Purchased Chocolate |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0406 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,352 | $1,460 | Not Implemented |
SF0406 # 07 Y:2012 | 07 | 2012 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $90,076 | $288,023 | Not Implemented |
SF0406 # 08 Y:2012 | 08 | 2012 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $25,304 | $93,999 | Not Implemented |
SF0406 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,696 | $10,439 | Not Implemented |
SF0406 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $4,954 | $21,408 | Not Implemented |
SF0394 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,204 | $73 | Implemented |
SF0394 # 02 Y:2011 | 02 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $439 | $235 | Implemented |
SF0394 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $2,952 | $3,821 | Implemented |
SF0394 # 04 Y:2011 | 04 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,879 | $3,638 | Implemented |
SF0394 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $7,621 | $11,002 | Implemented |
SF0394 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,794 | $20,780 | Implemented |
SF0394 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $241 | $700 | Implemented |
SF0394 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,002 | $12,392 | Not Implemented |
LE0284 # 01 Y:2009 | 01 | 2009 | UPGRADE OBSOLETE EQUIPMENT | $42,827 | $30,000 | Not Implemented |
LE0284 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,473 | $20,000 | Not Implemented |
LE0284 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,124 | $8,000 | Not Implemented |
LE0284 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,628 | $1,760 | Implemented |
LE0284 # 05 Y:2009 | 05 | 2009 | USE SOLAR HEAT TO HEAT WATER | $7,038 | $28,000 | Not Implemented |
LE0284 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,526 | $8,000 | Not Implemented |
LE0284 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,560 | $7,000 | Not Implemented |
LE0284 # 08 Y:2009 | 08 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,911 | $320 | Implemented |
LE0284 # 09 Y:2009 | 09 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $2,855 | $2,000 | Implemented |
LE0284 # 10 Y:2009 | 10 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $224 | Implemented |
LE0284 # 11 Y:2009 | 11 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $771 | $800 | Not Implemented |
LE0284 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,937 | $10,491 | Not Implemented |