IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

350

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0078 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $142 Implemented
LM0078 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,731 $0 Not Implemented
LM0078 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $182,520 $80,000 Not Implemented
LM0078 # 08 Y:2004 08 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $150,678 $1,000 Implemented
LM0078 # 10 Y:2004 10 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $298,998 $56,840 Implemented
LM0078 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,800 $1,220 Implemented
LM0078 # 12 Y:2004 12 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,036 $4,988 Not Implemented
SF0283 # 11 Y:2004 11 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $227,033 $40,600 Not Implemented
SF0283 # 10 Y:2004 10 2004 USE AN AUTOMATIC PLATE PROCESSOR $27,300 $40,500 Implemented
SF0283 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,066 $2,688 Implemented
SF0283 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,669 $10,828 Implemented
SF0283 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,284 $1,218 Implemented
SF0283 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,808 $20,000 Not Implemented
SF0283 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,990 $40,000 Implemented
SF0283 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,377 $31,490 Implemented
SF0283 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,636 $829 Implemented
SF0283 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,304 $0 Not Implemented
SF0283 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $0 Implemented
SF0278 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,074 $0 n/a
SF0278 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $3,660 $312 n/a
SF0278 # 03 Y:2004 03 2004 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $65,362 $60,000 n/a
SF0278 # 04 Y:2004 04 2004 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,624 $1,887 n/a
SF0278 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $454 n/a
SF0278 # 06 Y:2004 06 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,847 $3,074 n/a
SF0278 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $13,285 $24,474 n/a