Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,566
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0733 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,370 | $10 | Implemented |
AM0733 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,040 | $0 | Implemented |
AM0733 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $260 | $271 | Implemented |
AM0733 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,290 | $1,720 | Implemented |
UA0179 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $53,482 | $100,000 | Not Implemented |
UA0179 # 02 Y:2017 | 02 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $44,167 | $500 | Not Implemented |
UA0179 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,876 | $42,452 | Not Implemented |
UA0179 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,851 | $250 | Implemented |
UA0179 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,243 | $1,165 | Implemented |
UA0179 # 06 Y:2017 | 06 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,934 | $6,152 | Not Implemented |
UA0179 # 07 Y:2017 | 07 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,673 | $7,500 | Not Implemented |
UA0179 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $429 | $247 | Implemented |
UA0179 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,242 | $1,015 | Implemented |
LE0433 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,292 | $44 | Not Implemented |
LE0433 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,615 | $1,000 | Not Implemented |
LE0433 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $724 | $300 | Not Implemented |
LE0433 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,684 | $4,000 | Not Implemented |
LE0433 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,653 | $31,212 | Not Implemented |
LE0433 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $35,515 | $53,000 | Not Implemented |
LE0433 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,926 | $75,373 | Not Implemented |
LE0433 # 08 Y:2017 | 08 | 2017 | REPLACE BOILER | $397,300 | $900,000 | Not Implemented |
LE0433 # 09 Y:2017 | 09 | 2017 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $9,040 | $22,500 | Not Implemented |
LE0433 # 10 Y:2017 | 10 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,899 | $58,000 | Not Implemented |
LE0433 # 11 Y:2017 | 11 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,503 | $54,000 | Not Implemented |
LE0433 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,262 | $8,160 | Not Implemented |