Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,566
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0584 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,320 | $0 | Not Implemented |
OR0584 # 02 Y:2012 | 02 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $26,558 | $19,925 | Not Implemented |
OR0584 # 03 Y:2012 | 03 | 2012 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $16,839 | $29,000 | Not Implemented |
OR0584 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,631 | $27,000 | Not Implemented |
OR0584 # 05 Y:2012 | 05 | 2012 | MINIMIZE WATER USAGE | $4,574 | $7,000 | Not Implemented |
OR0584 # 06 Y:2012 | 06 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $7,796 | $19,701 | Not Implemented |
OR0584 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,152 | $251,677 | Not Implemented |
MI0227 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $63,004 | $11,425 | Implemented |
MI0227 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,352 | $21,342 | Not Implemented |
MI0227 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,918 | $1,660 | Implemented |
MI0227 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,932 | $19,454 | Implemented |
MI0227 # 05 Y:2012 | 05 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,886 | $142,619 | Implemented |
MI0227 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,306 | $12,160 | Implemented |
MI0227 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,036 | $13,230 | Not Implemented |
MI0227 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,569 | $8,859 | Not Implemented |
MI0227 # 09 Y:2012 | 09 | 2012 | HEAT WATER WITH EXHAUST HEAT | $6,137 | $8,859 | Not Implemented |
MI0227 # 10 Y:2012 | 10 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,975 | $3,480 | Not Implemented |
MI0227 # 11 Y:2012 | 11 | 2012 | INSTALL OCCUPANCY SENSORS | $3,170 | $3,500 | Not Implemented |
MI0225 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $114,097 | $23,031 | Implemented |
MI0225 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,492 | $29,008 | Not Implemented |
MI0225 # 03 Y:2012 | 03 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $27,049 | $190,339 | Implemented |
MI0225 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,052 | $1,660 | Implemented |
MI0225 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $13,619 | $520 | Implemented |
MI0225 # 06 Y:2012 | 06 | 2012 | USE POWER DURING OFF-PEAK PERIODS | $11,955 | $800 | Not Implemented |
MI0225 # 07 Y:2012 | 07 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,925 | $8,000 | Not Implemented |