IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,571

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0208 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $137,714 $144,177 Implemented
SU0208 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,975 $26,200 Not Implemented
SU0206 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,971 $0 Not Implemented
SU0206 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,139 $1,148 Implemented
SU0206 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,234 $1,352 Implemented
SU0206 # 04 Y:2005 04 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $255,262 $207,240 Implemented
SU0206 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $102,975 $200,000 n/a
NC0312 # 01 Y:2005 01 2005 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,776 $6,516 Not Implemented
NC0312 # 02 Y:2005 02 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,366 $1,300 Implemented
NC0312 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,325 $2,286 Implemented
NC0312 # 04 Y:2005 04 2005 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $1,377 $100 Not Implemented
NC0312 # 05 Y:2005 05 2005 REDUCE EXCESSIVE BOILER BLOWDOWN $152 $0 Implemented
NC0312 # 06 Y:2005 06 2005 DEVELOP A REPAIR/REPLACE POLICY $125 $273 Implemented
NC0312 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $169 $321 Implemented
NC0312 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100 $100 Implemented
NC0312 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $134 $100 Implemented
OR0478 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,420 $6,400 Implemented
OR0478 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,500 $1,900 Implemented
OR0478 # 03 Y:2005 03 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,700 $49,100 Implemented
OR0478 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,800 $0 Not Implemented
OR0475 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,030 $6,920 Not Implemented
OR0475 # 02 Y:2005 02 2005 AVOID FROST FORMATION ON EVAPORATORS $6,600 $1,500 Implemented
OR0475 # 03 Y:2005 03 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,300 $0 Not Implemented
OR0475 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,700 $0 Not Implemented
OR0475 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $920 $0 Not Implemented