IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,571

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0278 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $3,660 $312 n/a
SF0278 # 03 Y:2004 03 2004 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $65,362 $60,000 n/a
SF0278 # 04 Y:2004 04 2004 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,624 $1,887 n/a
SF0278 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $454 n/a
SF0278 # 06 Y:2004 06 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,847 $3,074 n/a
SF0278 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $13,285 $24,474 n/a
SF0278 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,293 $2,800 n/a
SF0278 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,230 $3,840 n/a
SF0278 # 10 Y:2004 10 2004 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $13,726 $60,000 n/a
SF0278 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,825 $34,552 n/a
AM0456 # 01 Y:2004 01 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $16,000 $16,900 Implemented
AM0456 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,100 $500 Implemented
AM0456 # 03 Y:2004 03 2004 REPAIR OR REPLACE STEAM TRAPS $6,850 $400 Implemented
AM0456 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,880 $1,010 Not Implemented
AM0456 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $400 Implemented
AM0456 # 06 Y:2004 06 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,100 $4,950 Implemented
AM0456 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $15 Not Implemented
AM0456 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $790 $230 Not Implemented
SU0175 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $839 $0 Implemented
SU0175 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $99,155 $3,104 Implemented
SU0175 # 03 Y:2004 03 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,889 $896 Implemented
SU0175 # 04 Y:2004 04 2004 MINIMIZE WATER USAGE $1,683 $427 Implemented
SU0175 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,174 $6,679 Implemented
SU0175 # 06 Y:2004 06 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,764 $8,647 Implemented
SU0175 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $468 Implemented