IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1004 # 05 Y:2019 05 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,751 $8,520 Not Implemented
OK1004 # 04 Y:2019 04 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $679 $1,295 Not Implemented
OK1004 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $255 $1,132 Not Implemented
OK1004 # 02 Y:2019 02 2019 IMPROVE COMBUSTION CONTROL CAPABILITY $5,516 $18,500 Not Implemented
OK1004 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,732 $6,990 Not Implemented
OK0910 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $18,886 $375 Implemented
OK0910 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,710 $2,471 Implemented
OK0910 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,664 $8,092 Not Implemented
OK0910 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,459 $247,939 Implemented
OK0910 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,605 $6,953 Not Implemented
OK0910 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,309 $1,250 Implemented
OK0910 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,177 $162,050 Not Implemented
OK0910 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,390 $2,440 Not Implemented
OK0910 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,631 $44,000 Not Implemented
OK0910 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $317 $46 Not Implemented
OK0910 # 11 Y:2015 11 2015 OPTIMIZE PLANT POWER FACTOR $11,042 $47,988 Not Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented
OK0713 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $561 $975 Not Implemented
OK0713 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,489 $3,283 Not Implemented
OK0713 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,796 $139,341 Not Implemented
OK0713 # 04 Y:2005 04 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $48,000 $35 Implemented
OK0713 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,346 $35 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0695 # 06 Y:2004 06 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,830 $0 Implemented
OK0695 # 05 Y:2004 05 2004 COMBINE UTILITY METERS $2,354 $2,546 Not Implemented