IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0561 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $84,544 $24,245 Implemented
OR0561 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $14,426 $7,234 Implemented
OR0561 # 01 Y:2010 01 2010 ISOLATE HOT OR COLD EQUIPMENT $7,124 $1,529 Implemented
OR0561 # 05 Y:2010 05 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $90,831 $106,316 Implemented
OR0561 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,786 $10,046 Implemented
OR0561 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,321 $3,321 Implemented
OR0561 # 04 Y:2010 04 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $18,820 $19,635 Implemented
OR0560 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,047 $0 Not Implemented
OR0560 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $36,273 $3,637 Not Implemented
OR0560 # 02 Y:2010 02 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $37,651 $90,666 Not Implemented
OR0560 # 01 Y:2010 01 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $68,119 $26,207 Not Implemented
OR0560 # 04 Y:2010 04 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,768 $0 Not Implemented
OR0560 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,400 $7,001 Not Implemented
OR0560 # 06 Y:2010 06 2010 OPTIMIZE PLANT POWER FACTOR $11,450 $23,156 Not Implemented
OR0560 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $10,085 $70,024 Not Implemented
OR0558 # 01 Y:2010 01 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,602 $2,965 Implemented
OR0558 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,102 $7,102 Implemented
OR0558 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $4,935 Implemented
OR0558 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $14,738 $120,911 Implemented
OR0558 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $25,798 $379,829 Not Implemented
OR0558 # 06 Y:2010 06 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $930 $1 Not Implemented
DL0057 # 10 Y:2010 10 2010 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $170,615 $510,000 Not Implemented
DL0057 # 04 Y:2010 04 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $10,305 $2,960 Implemented
DL0057 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $39,401 $83 Not Implemented
DL0057 # 02 Y:2010 02 2010 CLOSE OFF UNNEEDED STEAM LINES $8,876 $415 Implemented