IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0044 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,106 $2,500 Implemented
TR0044 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $109,638 $1,599,426 Not Implemented
TR0044 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $921 $260 Implemented
TR0044 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $363 $1,726 Implemented
LT8369 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,592 $12,831 n/a
LT8369 # 01 Y:2022 01 2022 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,717 $30,030 n/a
LT8369 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,568 $3,852 n/a
SF0591 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,418 $177,700 Not Implemented
SF0591 # 11 Y:2022 11 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $35,700 $132,000 Not Implemented
SF0591 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $18,051 Implemented
SF0591 # 08 Y:2022 08 2022 INSULATE FEEDWATER TANK $1,806 $4,445 Not Implemented
SF0591 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $14,724 Implemented
SF0591 # 06 Y:2022 06 2022 INSTALL SET-BACK TIMERS $22,648 $6,467 Implemented
SF0591 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $268 Not Implemented
SF0591 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,698 $0 Implemented
SF0591 # 03 Y:2022 03 2022 REDUCE EXCESS STEAM BLEEDING $9,616 $0 Implemented
SF0591 # 02 Y:2022 02 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,922 $0 Implemented
SF0591 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,537 $0 Not Implemented
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
AM0844 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,477 $114,525 Implemented
AM0844 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $30,169 $3,770 Not Implemented
AM0844 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,138 $331 Implemented