Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
691
matching recommendationsNAICS | 31141 | Frozen Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0577 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,364 | $0 | n/a |
SU0577 # 07 Y:2025 | 07 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $11,453 | $34,327 | n/a |
SU0577 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $299 | $63 | n/a |
SU0577 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $1,304 | $446 | n/a |
SU0577 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,941 | n/a |
SU0577 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,033 | $372 | n/a |
SU0577 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,400 | $0 | n/a |
DL0247 # 09 Y:2025 | 09 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $116,551 | $1,000,000 | n/a |
DL0247 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,958 | $200,000 | n/a |
DL0247 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,382 | $0 | n/a |
DL0247 # 04 Y:2025 | 04 | 2025 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $1,592 | $0 | n/a |
DL0247 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $399 | $0 | n/a |
DL0247 # 07 Y:2025 | 07 | 2025 | METER WASTE WATER | $34,580 | $145 | n/a |
DL0247 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $350 | $0 | n/a |
DL0247 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $993 | $0 | n/a |
DL0247 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,671 | $0 | n/a |
UU0259 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $221,450 | $2,473,450 | Not Implemented |
UU0259 # 06 Y:2024 | 06 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $3,995 | $9,200 | Implemented |
UU0259 # 05 Y:2024 | 05 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $53,643 | $33,000 | Implemented |
UU0259 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $205,038 | $1,865,253 | Implemented |
UU0259 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,165 | $110,030 | Implemented |
UU0259 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,866,540 | $17,885,484 | Not Implemented |
NL0099 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $240 | $35 | n/a |
NL0099 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $569,646 | $74,000 | n/a |
NL0099 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,201 | $140 | n/a |