Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0591 # 03 Y:2022 03 2022 REDUCE EXCESS STEAM BLEEDING $9,616 $0 Implemented
SF0591 # 08 Y:2022 08 2022 INSULATE FEEDWATER TANK $1,806 $4,445 Not Implemented
SF0591 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,698 $0 Implemented
SF0591 # 02 Y:2022 02 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,922 $0 Implemented
SF0591 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $14,724 Implemented
SF0591 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,537 $0 Not Implemented
SF0591 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,418 $177,700 Not Implemented
SF0591 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $18,051 Implemented
SF0591 # 06 Y:2022 06 2022 INSTALL SET-BACK TIMERS $22,648 $6,467 Implemented
SF0591 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $268 Not Implemented
SF0591 # 11 Y:2022 11 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $35,700 $132,000 Not Implemented
SF0554 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $1,140 $1,577 Not Implemented
SF0554 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $80 Implemented
SF0554 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $386 $404 Not Implemented
SF0554 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,802 $5,638 Not Implemented
SF0554 # 09 Y:2020 09 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $632 $1,312 Implemented
SF0554 # 02 Y:2020 02 2020 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $21,879 $20,311 Not Implemented
SF0554 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $1,245 Not Implemented
SF0554 # 07 Y:2020 07 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $871 $1,184 Implemented
SF0554 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,099 $13,511 Implemented
SF0554 # 10 Y:2020 10 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,351 $5,888 Implemented
SF0513 # 02 Y:2018 02 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $177,909 $41,250 Implemented
SF0513 # 03 Y:2018 03 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $66,148 $67,793 Implemented
SF0513 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $6,923 $0 Not Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented