IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

444

matching recommendations
Reset
NAICS 311411 Frozen Fruit, Juice, and Vegetable Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0313 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,967 $33,446 Implemented
MZ0313 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,725 $240 Implemented
BS0146 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,004 $1,690 Not Implemented
BS0146 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,336 $5,040 Not Implemented
BS0146 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $622 $1,174 Not Implemented
BS0146 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $159 Not Implemented
BS0146 # 05 Y:2021 05 2021 UPGRADE CONVEYORS $1,386 $1,888 Not Implemented
BS0146 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $686 $972 Not Implemented
MI0386 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,002 $1,484 Not Implemented
MI0386 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,559 $1,827 Implemented
MI0386 # 04 Y:2021 04 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,129 $15,000 Implemented
MI0386 # 03 Y:2021 03 2021 USE SOLAR HEAT TO HEAT WATER $10,324 $48,514 Not Implemented
MI0386 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,620 $43,782 Implemented
MI0386 # 01 Y:2021 01 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $247,190 $742,500 Not Implemented
SF0554 # 10 Y:2020 10 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,351 $5,888 Implemented
SF0554 # 09 Y:2020 09 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $632 $1,312 Implemented
SF0554 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $1,245 Not Implemented
SF0554 # 07 Y:2020 07 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $871 $1,184 Implemented
SF0554 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $1,140 $1,577 Not Implemented
SF0554 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,099 $13,511 Implemented
SF0554 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,802 $5,638 Not Implemented
SF0554 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $386 $404 Not Implemented
SF0554 # 02 Y:2020 02 2020 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $21,879 $20,311 Not Implemented
SF0554 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $80 Implemented
UF0539 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,651 $11,760 Not Implemented