Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 311411 | Frozen Fruit, Juice, and Vegetable Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0610 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,145 | $5,840 | Not Implemented |
OR0609 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,082 | $4,037 | Not Implemented |
OR0609 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $4,347 | $4,299 | Not Implemented |
OR0609 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,555 | $4,200 | Not Implemented |
OR0609 # 04 Y:2013 | 04 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,499 | $5,792 | Not Implemented |
OR0609 # 05 Y:2013 | 05 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,900 | $4,480 | Not Implemented |
OR0609 # 06 Y:2013 | 06 | 2013 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $142,102 | $374,500 | Not Implemented |
OR0609 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $117,782 | $160,770 | Implemented |
OR0609 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,018 | $5,875 | Not Implemented |
OR0609 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $28,299 | $42,000 | Not Implemented |
MI0225 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $114,097 | $23,031 | Implemented |
MI0225 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,492 | $29,008 | Not Implemented |
MI0225 # 03 Y:2012 | 03 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $27,049 | $190,339 | Implemented |
MI0225 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,052 | $1,660 | Implemented |
MI0225 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $13,619 | $520 | Implemented |
MI0225 # 06 Y:2012 | 06 | 2012 | USE POWER DURING OFF-PEAK PERIODS | $11,955 | $800 | Not Implemented |
MI0225 # 07 Y:2012 | 07 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,925 | $8,000 | Not Implemented |
MI0225 # 08 Y:2012 | 08 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,502 | $2,372 | Not Implemented |
MI0225 # 09 Y:2012 | 09 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,598 | $80 | Implemented |
MI0225 # 10 Y:2012 | 10 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,046 | $255 | Implemented |
MI0211 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $25,532 | $213,119 | Implemented |
MI0211 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,191 | $41,400 | Implemented |
MI0211 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,390 | $25,000 | Not Implemented |
MI0211 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,111 | $1,320 | Implemented |
MI0211 # 05 Y:2011 | 05 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,479 | $30,000 | Not Implemented |