Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 311411 | Frozen Fruit, Juice, and Vegetable Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0211 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,771 | $1,950 | Implemented |
MI0211 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,618 | $50 | Implemented |
MI0211 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $1,720 | Not Implemented |
MI0211 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,438 | $4,571 | Implemented |
UM0394 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,893 | $37,992 | Not Implemented |
UM0394 # 02 Y:2011 | 02 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $6,227 | $12,120 | Not Implemented |
UM0394 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $4,589 | $3,850 | Not Implemented |
UM0394 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,147 | $200 | Implemented |
UM0394 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $1,971 | $2,584 | Implemented |
UM0394 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,811 | $5,000 | Not Implemented |
UM0394 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $1,389 | $1,350 | Not Implemented |
UM0394 # 08 Y:2011 | 08 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $180 | $10 | Not Implemented |
UM0394 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,902 | $10,000 | Not Implemented |
MI0210 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,568 | $175,700 | Not Implemented |
MI0210 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,559 | $7,338 | Not Implemented |
MI0210 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,805 | $1,320 | Implemented |
MI0210 # 04 Y:2011 | 04 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,342 | $1,350 | Not Implemented |
MI0210 # 05 Y:2011 | 05 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,730 | $26,000 | Implemented |
MI0210 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,125 | $133,000 | Implemented |
MI0210 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,851 | $20,000 | Not Implemented |
MI0210 # 08 Y:2011 | 08 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,463 | $16,554 | Not Implemented |
MI0210 # 09 Y:2011 | 09 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,131 | $30,000 | Not Implemented |
MI0210 # 10 Y:2011 | 10 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $8,346 | $10,000 | Implemented |
MI0210 # 11 Y:2011 | 11 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,145 | $8,889 | Implemented |
MI0210 # 12 Y:2011 | 12 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,455 | $2,425 | Implemented |