41
matching recommendationsNAICS | 311411 | Frozen Fruit, Juice, and Vegetable Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0561 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $3,321 | Implemented |
OR0561 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $10,046 | Implemented |
OR0561 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $90,831 | $106,316 | Implemented |
OR0561 # 04 Y:2010 | 04 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $18,820 | $19,635 | Implemented |
OR0561 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $14,426 | $7,234 | Implemented |
OR0561 # 02 Y:2010 | 02 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $84,544 | $24,245 | Implemented |
OR0561 # 01 Y:2010 | 01 | 2010 | ISOLATE HOT OR COLD EQUIPMENT | $7,124 | $1,529 | Implemented |
OR0560 # 06 Y:2010 | 06 | 2010 | OPTIMIZE PLANT POWER FACTOR | $11,450 | $23,156 | Not Implemented |
OR0560 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $68,119 | $26,207 | Not Implemented |
OR0560 # 02 Y:2010 | 02 | 2010 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $37,651 | $90,666 | Not Implemented |
OR0560 # 03 Y:2010 | 03 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,047 | $0 | Not Implemented |
OR0560 # 04 Y:2010 | 04 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $11,768 | $0 | Not Implemented |
OR0560 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,400 | $7,001 | Not Implemented |
OR0560 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,273 | $3,637 | Not Implemented |
OR0560 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $10,085 | $70,024 | Not Implemented |
OR0558 # 01 Y:2010 | 01 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,602 | $2,965 | Implemented |
OR0558 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,102 | $7,102 | Implemented |
OR0558 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,319 | $4,935 | Implemented |
OR0558 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $14,738 | $120,911 | Implemented |
OR0558 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,798 | $379,829 | Not Implemented |
OR0558 # 06 Y:2010 | 06 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $930 | $1 | Not Implemented |
UW0039 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $13,491 | $20,784 | Not Implemented |
UW0039 # 01 Y:2010 | 01 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $51,027 | $70,000 | Not Implemented |
UW0039 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,997 | $26,825 | Not Implemented |
OR0557 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $615 | $353 | Not Implemented |