IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

624

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2408 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,002 $144,549 n/a
LS2408 # 03 Y:2024 03 2024 REPLACE BOILER $57,645 $247,500 n/a
LS2408 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $135 n/a
AS0577 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,679 $30,000 n/a
AS0577 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $20,991 $20,000 n/a
AS0577 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $165,792 $921,043 n/a
AS0577 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,824 $34,114 n/a
AS0577 # 06 Y:2024 06 2024 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,086 $15,866 n/a
AS0577 # 07 Y:2024 07 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,172 $2,798 n/a
AS0577 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,281 $406 n/a
AS0577 # 09 Y:2024 09 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $388 $1,579 n/a
AS0577 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $242,289 $2,885,843 n/a
SF0582 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $376 $961 Not Implemented
SF0582 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $29,881 $2,290 Implemented
SF0582 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,570 $11,279 Not Implemented
SF0582 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,094 $17,764 Implemented
SF0582 # 04 Y:2022 04 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,294 $2,290 Implemented
SF0582 # 02 Y:2022 02 2022 MODIFY STARTUP/SHUTDOWN TIMES $7,144 $0 Implemented
SF0582 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,257 $45,587 Implemented
SF0582 # 09 Y:2022 09 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,070 $11,782 Implemented
SF0582 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,960 $0 Implemented
SF0582 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,836 $41,117 Implemented
BS0142 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,675 $335 Not Implemented
BS0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $53 $75 Not Implemented
BS0142 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $888 $1,944 Not Implemented