IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0312 # 01 Y:2011 01 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $39,912 $50,000 Not Implemented
LE0312 # 02 Y:2011 02 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $14,396 $30,000 Not Implemented
LE0312 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $24,192 $75,014 Implemented
LE0312 # 04 Y:2011 04 2011 INSTALL TIMERS AND/OR THERMOSTATS $15,944 $70 Implemented
LE0312 # 05 Y:2011 05 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,770 $700 Not Implemented
LE0312 # 06 Y:2011 06 2011 USE RADIANT HEATER FOR SPOT HEATING $8,883 $2,500 Implemented
LE0312 # 07 Y:2011 07 2011 INSTALL TIMERS AND/OR THERMOSTATS $8,857 $0 Implemented
LE0312 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,822 $49,208 Implemented
LE0312 # 09 Y:2011 09 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,246 $3,000 Not Implemented
LE0312 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,609 $9,000 Not Implemented
LE0312 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,507 $1,760 Implemented
LE0312 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,543 $398 Not Implemented
LE0312 # 13 Y:2011 13 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,614 $1,000 Not Implemented
LE0312 # 14 Y:2011 14 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $800 Not Implemented
LE0312 # 17 Y:2011 17 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,966 $18,137 Not Implemented
LE0193 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $105,726 $58,053 n/a
LE0193 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,349 $3,768 Implemented
LE0193 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $11,953 $4,508 Implemented
LE0193 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,252 $10,720 Not Implemented
LE0193 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,446 $2,000 Implemented
LE0193 # 03 Y:2004 03 2004 REPAIR OR REPLACE STEAM TRAPS $17,227 $492 Implemented
LE0193 # 01 Y:2004 01 2004 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $192,339 $50,000 n/a
LE0193 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $150 Implemented
WV0262 # 15 Y:2003 15 2003 MINIMIZE WATER USAGE $33,252 $9,000 Not Implemented
WV0262 # 14 Y:2003 14 2003 REPAIR OR REPLACE STEAM TRAPS $3,018 $1,000 Implemented