IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

624

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0287 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,439 $160 Not Implemented
MI0287 # 05 Y:2015 05 2015 USE OPTIMUM THICKNESS INSULATION $2,395 $8,535 Not Implemented
MI0287 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,450 $3,140 Implemented
MI0287 # 07 Y:2015 07 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,047 $280 Not Implemented
MI0287 # 08 Y:2015 08 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $907 $336 Not Implemented
MI0287 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $397 $709 Implemented
MI0287 # 10 Y:2015 10 2015 USE PHOTOCELL CONTROLS $184 $600 Implemented
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
TT0160 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $112,350 $2,000 Not Implemented
TT0160 # 02 Y:2015 02 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,461 $298 Implemented
TT0160 # 03 Y:2015 03 2015 REPAIR AND ELIMINATE STEAM LEAKS $13,910 $100 Not Implemented
TT0160 # 04 Y:2015 04 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $10,534 $21,195 Implemented
TT0160 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,397 $10,000 Not Implemented
TT0160 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $8,554 $14,129 Not Implemented
TT0160 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,882 $0 Not Implemented
TT0160 # 08 Y:2015 08 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,322 $0 Not Implemented
TT0160 # 09 Y:2015 09 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $1,335 $2,000 Not Implemented
TT0160 # 10 Y:2015 10 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $527 $1,176 Not Implemented
OK0910 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,631 $44,000 Not Implemented