IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 311423 Dried and Dehydrated Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0581 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,991 $61,830 Not Implemented
SF0581 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,942 $0 Not Implemented
SF0581 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $488 $0 Not Implemented
SF0581 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,255 $300 Not Implemented
SF0581 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,523 $1,537 Not Implemented
SF0581 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $7,711 $3,227 Not Implemented
SF0581 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,550 $1,334 Not Implemented
SF0581 # 07 Y:2022 07 2022 REPAIR AND ELIMINATE STEAM LEAKS $2,960 $2,345 Not Implemented
SF0581 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $202 $192 Not Implemented
SF0581 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,582 $23,946 Not Implemented
SF0424 # 02 Y:2013 02 2013 REDUCE FLUID FLOW RATES $17,815 $0 Not Implemented
SF0424 # 09 Y:2013 09 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,508 $26,000 Not Implemented
SF0424 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,020 $4,007 Not Implemented
SF0424 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,423 $291,716 Implemented
SF0424 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $7,962 $46,705 Implemented
SF0424 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,537 $3,594 Not Implemented
SF0424 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,404 $1,224 Not Implemented
SF0424 # 03 Y:2013 03 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $10,307 $0 Implemented
SF0424 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,789 $0 Implemented
SF0413 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,499 $409,247 Implemented
SF0413 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $256 $684 Not Implemented
SF0413 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $380 $2,139 Not Implemented
SF0413 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,032 $1,872 Not Implemented
SF0413 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $380 Implemented
SF0413 # 01 Y:2012 01 2012 COMBINE UTILITY METERS $27,096 $10,000 Not Implemented