Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,413
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0132 # 03 Y:2019 | 03 | 2019 | OPERATE BOILERS ON HIGH FIRE SETTING | $51,880 | $0 | Not Implemented |
BS0132 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $11,835 | $21,198 | Not Implemented |
BS0132 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,164 | $15,537 | Not Implemented |
BS0132 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $5,715 | $8,435 | Not Implemented |
BS0132 # 07 Y:2019 | 07 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $6,466 | $6,828 | Not Implemented |
BS0132 # 08 Y:2019 | 08 | 2019 | AVOID FROST FORMATION ON EVAPORATORS | $3,938 | $2,781 | Not Implemented |
BS0132 # 09 Y:2019 | 09 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,840 | $16,194 | Not Implemented |
BS0132 # 10 Y:2019 | 10 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $682 | $1,005 | Not Implemented |
BS0132 # 11 Y:2019 | 11 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $14,577 | $12,760 | Not Implemented |
OK1016 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,210 | $730 | Not Implemented |
OK1016 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,028 | $28,358 | Implemented |
OK1016 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,766 | $9,480 | Not Implemented |
OK1016 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,330 | $0 | Implemented |
OK1016 # 05 Y:2019 | 05 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,523 | $0 | Not Implemented |
OK1016 # 06 Y:2019 | 06 | 2019 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $885 | $4,860 | Not Implemented |
OK1016 # 07 Y:2019 | 07 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $485 | $636 | Implemented |
IP0125 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,774 | $150 | Not Implemented |
IP0125 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,180 | $354 | Implemented |
IP0125 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $932 | $315 | Implemented |
IP0125 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,344 | Implemented |
IP0125 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $269 | $500 | Implemented |
IP0125 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,324 | $8,560 | Implemented |
IP0125 # 07 Y:2019 | 07 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,364 | $6,720 | Implemented |
IP0125 # 08 Y:2019 | 08 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $133 | $390 | Implemented |
BS0125 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,168 | $10,162 | Not Implemented |