IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,364

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0151 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,973 $7,800 Not Implemented
UU0151 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,760 $100 Not Implemented
AS0471 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85,359 $279,692 Implemented
AS0471 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,374 $5,020 Not Implemented
AS0471 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,003 $2,108 Not Implemented
AS0471 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $157 $0 Implemented
UF0528 # 01 Y:2019 01 2019 ISOLATE HOT OR COLD EQUIPMENT $6,559 $10,250 Not Implemented
UF0528 # 02 Y:2019 02 2019 INSTALL TURBULATORS $5,011 $7,500 Implemented
UF0528 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,410 $1,400 Not Implemented
UF0528 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $456 Implemented
UF0528 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,168 $6,439 Not Implemented
UF0528 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,284 $3,000 Implemented
UF0528 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $2,054 $1,025 Implemented
UF0528 # 08 Y:2019 08 2019 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $1,676 $5,000 Not Implemented
UD0995 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $3,767 $0 Not Implemented
UD0995 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,443 $1,500 Implemented
UD0995 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $5,974 $1,800 Implemented
UD0995 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,159 $3,500 Implemented
UD0995 # 05 Y:2019 05 2019 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $110,256 $150,000 Not Implemented
UD0995 # 06 Y:2019 06 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $35,713 $75,000 Not Implemented
UD0995 # 07 Y:2019 07 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $5,847 $11,694 Implemented
UD0995 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $606 $0 Implemented
UD0995 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,887 $17,856 Implemented
AS0464 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $59,350 $126,000 Implemented
AS0464 # 02 Y:2019 02 2019 USE SOLAR HEAT FOR HEAT $48,323 $319,500 Not Implemented