IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 01 Y:2015 01 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,308,919 $1,300,000 Implemented
OR0594 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $2,867 $2,708 Not Implemented
OR0594 # 05 Y:2012 05 2012 INSTALL AUTOMATIC STACK DAMPER $3,989 $5,325 Not Implemented
OR0594 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,684 $7,360 Implemented
OR0594 # 03 Y:2012 03 2012 Install Anaerobic Digester $1,369,423 $3,468,069 Implemented
OR0594 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $163,282 $119,416 Not Implemented
OR0594 # 01 Y:2012 01 2012 INSTALL AN UNINTERUPTABLE POWER SUPPLY $393,360 $20,880 Not Implemented
OR0583 # 01 Y:2012 01 2012 AVOID FROST FORMATION ON EVAPORATORS $3,140 $2,412 Implemented
OR0583 # 02 Y:2012 02 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,994 $10,000 Not Implemented
OR0583 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $19,592 Implemented
OR0583 # 04 Y:2012 04 2012 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,078 $500 Implemented
OR0583 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,391 $3,854 Implemented
OR0583 # 06 Y:2012 06 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,779 $6,600 Implemented
OR0559 # 02 Y:2010 02 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,300 $6,712 Not Implemented
OR0559 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,126 $1 Not Implemented
OR0559 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,495 $3,495 Not Implemented
OR0559 # 05 Y:2010 05 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,771 $40,000 Not Implemented
OR0559 # 06 Y:2010 06 2010 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $26,673 $64,505 Not Implemented
OR0559 # 07 Y:2010 07 2010 INSTALL REPLACEMENT DOORS $7,531 $16,375 Not Implemented
OR0559 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $25,044 $36,275 Not Implemented
OR0507 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $1,600 $1,200 Not Implemented
OR0507 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $32,400 $23,200 Not Implemented
OR0507 # 02 Y:2006 02 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,800 $2,000 Implemented
OR0507 # 03 Y:2006 03 2006 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $13,600 $3,200 Not Implemented