Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,437
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0459 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $500 | Implemented |
IA0459 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $450 | Not Implemented |
OR0559 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $25,044 | $36,275 | Not Implemented |
OR0559 # 02 Y:2010 | 02 | 2010 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,300 | $6,712 | Not Implemented |
OR0559 # 03 Y:2010 | 03 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,126 | $1 | Not Implemented |
OR0559 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,495 | $3,495 | Not Implemented |
OR0559 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,771 | $40,000 | Not Implemented |
OR0559 # 06 Y:2010 | 06 | 2010 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $26,673 | $64,505 | Not Implemented |
OR0559 # 07 Y:2010 | 07 | 2010 | INSTALL REPLACEMENT DOORS | $7,531 | $16,375 | Not Implemented |
IA0451 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $1,729 | Implemented |
IA0451 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,102 | $1,000 | Implemented |
IA0451 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,659 | $140 | Implemented |
IA0451 # 04 Y:2010 | 04 | 2010 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $3,433 | $500 | Implemented |
IA0451 # 05 Y:2010 | 05 | 2010 | REDUCE VENTILATION AIR | $1,483 | $2,000 | Implemented |
IA0451 # 06 Y:2010 | 06 | 2010 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,080 | $240,000 | Not Implemented |
UW0035 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,000 | $0 | Not Implemented |
UW0035 # 02 Y:2010 | 02 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $28,000 | $77,000 | Implemented |
UW0035 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,058 | $1 | Implemented |
UW0035 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,417 | $0 | Not Implemented |
UW0035 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $3,700 | $2,000 | Implemented |
LE0290 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,385 | $1,200 | Not Implemented |
LE0290 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,837 | $15,700 | Not Implemented |
LE0290 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,929 | $2,000 | Not Implemented |
LE0290 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,543 | $750 | Implemented |
LE0290 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,148 | $152 | Not Implemented |