IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,413

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0442 # 01 Y:2003 01 2003 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $27,900 $23,290 Not Implemented
OR0442 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,500 $11,700 Implemented
OR0442 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $11,250 $1,340 Not Implemented
OR0442 # 04 Y:2003 04 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,900 $0 Implemented
OR0442 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $0 Implemented
OR0442 # 06 Y:2003 06 2003 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $580 $1,400 Not Implemented
OR0441 # 01 Y:2003 01 2003 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $65,260 $70,100 Implemented
OR0441 # 02 Y:2003 02 2003 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $18,970 $2,160 Implemented
OR0441 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,670 $985 Implemented
OR0441 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $10,080 Implemented
SF0269 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,192 $0 Not Implemented
SF0269 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $635 $0 Implemented
SF0269 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,974 $0 Not Implemented
SF0269 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $5,516 $3,984 Not Implemented
SF0269 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,653 $0 Implemented
SF0269 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,739 $3,905 Not Implemented
SF0269 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $633 $1,743 Not Implemented
IA0325 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,064 $1,000 Implemented
IA0325 # 02 Y:2003 02 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,881 $2,200 Not Implemented
IA0325 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $53,817 $18,000 Implemented
IA0325 # 04 Y:2003 04 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,965 $4,000 Not Implemented
IA0325 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $957 $245 Implemented
IA0325 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $25 Implemented
IA0325 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,473 $11,035 Implemented
IA0325 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $53 $133 Not Implemented