Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0836 # 10 Y:2011 | 10 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,389 | $10,000 | Not Implemented |
UD0836 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,293 | $18,000 | Not Implemented |
UD0836 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,572 | $99,100 | Not Implemented |
UD0836 # 07 Y:2011 | 07 | 2011 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,875 | $15,000 | Not Implemented |
UD0836 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,960 | $1,140 | Not Implemented |
UD0836 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,178 | $1,000 | Not Implemented |
UD0836 # 04 Y:2011 | 04 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,847 | $32,000 | Not Implemented |
UD0836 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,689 | $7,000 | Not Implemented |
UM0272 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,828 | $1,000 | Implemented |
UM0272 # 02 Y:2005 | 02 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $3,000 | Not Implemented |
UM0272 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,631 | $300 | Implemented |
UM0272 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,459 | $5,009 | Not Implemented |
UD0701 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $397 | $30 | Not Implemented |
UD0701 # 13 Y:2004 | 13 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $3,294 | Not Implemented |
UD0701 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,315 | $16,140 | Not Implemented |
UD0701 # 11 Y:2004 | 11 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,373 | $146 | Not Implemented |
UD0701 # 10 Y:2004 | 10 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,896 | $4,800 | Not Implemented |
UD0701 # 09 Y:2004 | 09 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,926 | $0 | Not Implemented |
UD0701 # 08 Y:2004 | 08 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,179 | $4,000 | Not Implemented |
UD0701 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,577 | $16,000 | Not Implemented |
UD0701 # 06 Y:2004 | 06 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,494 | $1,500 | Not Implemented |
UD0701 # 05 Y:2004 | 05 | 2004 | REDUCE VENTILATION AIR | $22,847 | $31,250 | Not Implemented |
UD0701 # 04 Y:2004 | 04 | 2004 | REDUCE OR ELIMINATE WASTE | $38,220 | $620 | Not Implemented |
UD0701 # 03 Y:2004 | 03 | 2004 | METER WASTE WATER | $51,851 | $15,700 | Not Implemented |
UD0701 # 02 Y:2004 | 02 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $55,242 | $1,619 | Not Implemented |