Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
619
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0112 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,737 | $0 | Not Implemented |
MZ0112 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,303 | $1,160 | Not Implemented |
MZ0112 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,024 | $1,150 | Not Implemented |
MZ0112 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,329 | $0 | Not Implemented |
MZ0112 # 09 Y:2013 | 09 | 2013 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $61,800 | $450,000 | Not Implemented |
MZ0112 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,415 | $0 | Implemented |
MZ0112 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,576 | $14,260 | Implemented |
MZ0112 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $6,417 | $3,000 | Implemented |
MZ0112 # 05 Y:2013 | 05 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $48,000 | $2,270 | Implemented |
BS0009 # 06 Y:2013 | 06 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,422 | $3,959 | Implemented |
BS0009 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,187 | $1,066 | Not Implemented |
BS0009 # 08 Y:2013 | 08 | 2013 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $11,756 | $210 | Not Implemented |
BS0009 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,495 | $1,840 | Not Implemented |
BS0009 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,591 | $260 | Implemented |
BS0009 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,077 | $689 | Implemented |
BS0009 # 09 Y:2013 | 09 | 2013 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $743,387 | $1,700,000 | Not Implemented |
BS0009 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,533 | $2,806 | Not Implemented |
BS0009 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,037 | $126 | Implemented |
SU0336 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $250 | $12,804 | Implemented |
SU0336 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $31 | $0 | Implemented |
SU0336 # 02 Y:2013 | 02 | 2013 | USE SOLAR HEAT TO HEAT WATER | $458 | $10,804 | Not Implemented |
WM0018 # 12 Y:2013 | 12 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,257 | $0 | Not Implemented |
WM0018 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,891 | $20,000 | Not Implemented |
WM0018 # 08 Y:2013 | 08 | 2013 | INSTALL OCCUPANCY SENSORS | $1,910 | $1,850 | Not Implemented |
WM0018 # 07 Y:2013 | 07 | 2013 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $155 | $480 | Not Implemented |