Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
563
matching recommendationsNAICS | 311511 | Fluid Milk Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS020 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,764 | $7,000 | Implemented |
MAS020 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,617 | $60,000 | Not Implemented |
MAS020 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,203 | $7,700 | Not Implemented |
MAS020 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,667 | $11,600 | Implemented |
MAS020 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESS STEAM BLEEDING | $1,611 | $500 | Implemented |
UF0443 # 01 Y:2011 | 01 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,607 | $0 | Implemented |
UF0443 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,731 | $42,492 | Implemented |
UF0443 # 03 Y:2011 | 03 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,454 | $38,200 | Not Implemented |
UF0443 # 04 Y:2011 | 04 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $4,722 | $550 | Not Implemented |
UF0443 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $562 | $75 | Implemented |
UF0443 # 06 Y:2011 | 06 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $19,349 | $2,235 | Implemented |
UF0443 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $106,353 | $25,300 | Not Implemented |
UF0443 # 08 Y:2011 | 08 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $156 | $370 | Not Implemented |
UF0443 # 09 Y:2011 | 09 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,522 | $8,600 | Not Implemented |
UF0443 # 10 Y:2011 | 10 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,822 | $670 | Not Implemented |
UD0836 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,705 | $2,196 | Not Implemented |
UD0836 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,796 | $36 | Not Implemented |
UD0836 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,689 | $7,000 | Not Implemented |
UD0836 # 04 Y:2011 | 04 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,847 | $32,000 | Not Implemented |
UD0836 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,178 | $1,000 | Not Implemented |
UD0836 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,960 | $1,140 | Not Implemented |
UD0836 # 07 Y:2011 | 07 | 2011 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,875 | $15,000 | Not Implemented |
UD0836 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,572 | $99,100 | Not Implemented |
UD0836 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,293 | $18,000 | Not Implemented |
UD0836 # 10 Y:2011 | 10 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,389 | $10,000 | Not Implemented |