IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0160 # 07 Y:2020 07 2020 Hire Energy Manager $50,000 $2,700 Not Implemented
UU0160 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $1,140 Not Implemented
UU0160 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,220 $23,540 Implemented
UU0160 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $14,460 $13,100 Implemented
UU0160 # 03 Y:2020 03 2020 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $30,330 $4,800 Not Implemented
UU0160 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,050 $179,660 Implemented
UU0160 # 01 Y:2020 01 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $47,740 $212,490 Implemented
UU0151 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,969 $1,000 Not Implemented
UU0151 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,760 $100 Not Implemented
UU0151 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,973 $7,800 Not Implemented
UU0151 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,157 $1,000 Not Implemented
UU0151 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,711 $37,970 Not Implemented
UU0151 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $17,315 $25,000 Not Implemented
UU0151 # 01 Y:2019 01 2019 OPERATE BOILERS ON HIGH FIRE SETTING $63,057 $1,000 Not Implemented
UU0131 # 01 Y:2018 01 2018 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $242,000 $1,000 Implemented
UU0131 # 07 Y:2018 07 2018 INSTALL REPLACEMENT DOORS $4,539 $300 Implemented
UU0131 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $6,501 $2,665 Not Implemented
UU0131 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,477 $150 Implemented
UU0131 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $17,732 $2,030 Implemented
UU0131 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,471 $39,272 Implemented
UU0131 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,380 $1,000 Implemented