IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 311513 Cheese Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0393 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $155 $300 Implemented
BD0393 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $10 Implemented
BD0393 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,084 $1,500 Not Implemented
BD0393 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,570 $9,600 Not Implemented
BD0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,288 $107,000 Implemented
BD0393 # 02 Y:2011 02 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,510 $10,000 Not Implemented
BD0393 # 01 Y:2011 01 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $54,406 $4,000 Not Implemented
BD0289 # 02 Y:2005 02 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,957 $0 Implemented
BD0289 # 11 Y:2005 11 2005 $57,600 $105,000 Implemented
BD0289 # 09 Y:2005 09 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $315 $576 Implemented
BD0289 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $484 $0 Implemented
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented
BD0289 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $694 $900 Not Implemented
BD0289 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $910 $1,050 Implemented
BD0289 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,500 Not Implemented
BD0289 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,275 $6,900 Implemented
BD0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,189 $3,500 Implemented
BD0289 # 10 Y:2005 10 2005 $1,052 $0 Not Implemented
IC0076 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,820 $1,000 Implemented
IC0076 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $0 Not Implemented
IC0076 # 10 Y:2004 10 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,261 $5,660 Implemented
IC0076 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $501 Not Implemented
IC0076 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $5,168 $7,933 Implemented
IC0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,259 $13,444 Implemented
IC0076 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,310 $39,933 n/a