IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
NAICS 311514 Dry, Condensed, and Evaporated Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0224 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,943 $0 Implemented
SU0224 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,147 $0 Implemented
SU0224 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,039 $0 Implemented
SU0224 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,650 $958 Implemented
SU0224 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,340 $825 Implemented
SU0224 # 07 Y:2006 07 2006 KEEP BOILER TUBES CLEAN $2,726 $1,466 Implemented
SU0224 # 08 Y:2006 08 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $79,657 $50,307 Implemented
SU0224 # 09 Y:2006 09 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $43,464 $52,154 Implemented
SU0224 # 10 Y:2006 10 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,736 $14,580 Implemented
SU0224 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $77 $348 Implemented
SU0224 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,037 $11,000 Implemented
SU0224 # 13 Y:2006 13 2006 REDUCE VENTILATION AIR $2,430 $15,374 Implemented
SU0220 # 01 Y:2005 01 2005 KEEP BOILER TUBES CLEAN $17,434 $0 Implemented
SU0220 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $488 $0 Implemented
SU0220 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,114 $10,000 Implemented
SU0220 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,882 $765 Implemented
SU0220 # 07 Y:2005 07 2005 REPAIR OR REPLACE STEAM TRAPS $8,034 $2,780 Implemented
SU0220 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,271 $667 Implemented
SU0220 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $408 Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
UU0057 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $100 Implemented
UU0057 # 09 Y:2004 09 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,920 $0 Implemented
UU0057 # 10 Y:2004 10 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $398 $20 Implemented
OR0441 # 01 Y:2003 01 2003 $65,260 $70,100 Implemented