Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0899 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,057 | $0 | Not Implemented |
UD0899 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $0 | Implemented |
UD0899 # 03 Y:2014 | 03 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $85 | $0 | Not Implemented |
UD0899 # 04 Y:2014 | 04 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,795 | $4,550 | Not Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |
UD0899 # 06 Y:2014 | 06 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,303 | $0 | Implemented |
UD0899 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,350 | $7,126 | Not Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |
UD0899 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,254 | $15,180 | Not Implemented |
UD0899 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,255 | $5,850 | Not Implemented |
UD0899 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,635 | $3,920 | Not Implemented |
NC0507 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,167 | $23,000 | Not Implemented |
NC0507 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,846 | $43,969 | Not Implemented |
NC0507 # 03 Y:2014 | 03 | 2014 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $51,724 | $62,000 | Not Implemented |
NC0507 # 04 Y:2014 | 04 | 2014 | KEEP BOILER TUBES CLEAN | $6,811 | $2,000 | Implemented |
NC0507 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $806 | $650 | Not Implemented |
NC0507 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $264 | $50 | Implemented |
NC0507 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $1,828 | $1,018 | Not Implemented |
NC0507 # 08 Y:2014 | 08 | 2014 | USE PHOTOCELL CONTROLS | $72 | $80 | Not Implemented |
NC0507 # 09 Y:2014 | 09 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,801 | $10,912 | Implemented |
CO0678 # 01 Y:2013 | 01 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,330 | $14,900 | Not Implemented |
CO0678 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $200 | Implemented |
CO0678 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,340 | $8,100 | Not Implemented |
CO0678 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $890 | $350 | Not Implemented |
CO0678 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,580 | $15,680 | Not Implemented |