IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,427

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0361 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,705 $3,219 Not Implemented
LE0361 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $111,477 $124,700 Not Implemented
LE0361 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,891 $30,200 Not Implemented
LE0361 # 06 Y:2013 06 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $169 $500 Not Implemented
SF0422 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,969 $0 Not Implemented
SF0422 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $642 $43 Not Implemented
SF0422 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $36,414 $12,500 Not Implemented
SF0422 # 04 Y:2012 04 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $47,040 $16,100 Not Implemented
SF0422 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $662 $228 Not Implemented
SF0422 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $9,464 $10,283 Not Implemented
SF0422 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,287 $3,924 Not Implemented
SF0422 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,288 $3,390 Not Implemented
SF0422 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,693 $31,027 Not Implemented
SF0422 # 10 Y:2012 10 2012 ADOPT IN-HOUSE MATERIAL GENERATION $15,798 $22,322 Not Implemented
SD0458 # 01 Y:2012 01 2012 REDESIGN PROCESS $272,976 $164,279 Not Implemented
SD0458 # 02 Y:2012 02 2012 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $46,732 $123,300 Not Implemented
SD0458 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,502 $58,740 Not Implemented
SD0458 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,833 $11,000 Not Implemented
SD0458 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,667 $34,450 Implemented
SD0458 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $7,861 $8,422 Not Implemented
SD0458 # 07 Y:2012 07 2012 USE MINIMUM STEAM OPERATING PRESSURE $1,107 $200 Not Implemented
SD0457 # 01 Y:2012 01 2012 UPGRADE OBSOLETE EQUIPMENT $111,057 $145,000 Not Implemented
SD0457 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $77,740 $9,900 Implemented
SD0457 # 03 Y:2012 03 2012 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $66,646 $142,500 Not Implemented
SD0457 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,364 $89,136 Implemented