Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0340 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,109 | $37,572 | Not Implemented |
UF0340 # 08 Y:2004 | 08 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,678 | $7,900 | Implemented |
GT0778 # 01 Y:2004 | 01 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $6,613 | $33,628 | Not Implemented |
GT0778 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,032 | $3,228 | Implemented |
GT0778 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,134 | $100 | Not Implemented |
GT0778 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $927 | $600 | Implemented |
GT0778 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $719 | $600 | Not Implemented |
GT0778 # 06 Y:2004 | 06 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $5,788 | $13,000 | Not Implemented |
GT0778 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,155 | $9,815 | Not Implemented |
IC0072 # 01 Y:2004 | 01 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $30,046 | $118,316 | n/a |
IC0072 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $6,541 | n/a |
IC0072 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $1,003 | $398 | n/a |
IC0072 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,385 | $2,462 | n/a |
IC0072 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,433 | $1,100 | n/a |
IC0072 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,391 | $850 | n/a |
IC0072 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $4,320 | n/a |
IC0072 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,965 | $40,012 | n/a |
IC0072 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $2,235 | $14,043 | n/a |
IC0072 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,554 | $29,500 | n/a |
IC0072 # 11 Y:2004 | 11 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $646 | $0 | n/a |
OK0670 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,939 | $27,543 | Not Implemented |
OK0670 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,120 | $0 | Implemented |
OK0670 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $12,292 | $0 | Implemented |
OK0670 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,304 | $4,211 | Not Implemented |
OK0670 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,797 | $113,450 | Not Implemented |