Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0580 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $110 | $0 | n/a |
SU0580 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,986 | $0 | n/a |
SU0580 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $436 | $1,102 | n/a |
SU0580 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $243 | $531 | n/a |
SU0580 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $281 | $370 | n/a |
SU0580 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $172 | $69 | n/a |
SU0580 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $404 | $89 | n/a |
SU0580 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,993 | $246 | n/a |
LE0601 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $40,859 | $167,895 | n/a |
LE0601 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,248 | $44,740 | n/a |
LE0601 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,625 | $210,000 | n/a |
LE0601 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $636 | $1,081 | n/a |
LE0601 # 05 Y:2025 | 05 | 2025 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,412 | $23,182 | n/a |
LE0601 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $55,828 | $52,000 | n/a |
LE0601 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,225 | $3,680 | n/a |
LE0601 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $44,588 | $1,600 | n/a |
LE0601 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,356 | $0 | n/a |
NL0109 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $45,070 | $240,000 | n/a |
NL0109 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $12,694 | $500 | n/a |
NL0109 # 03 Y:2025 | 03 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,510 | $2,000 | n/a |
NL0109 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $2,080 | n/a |
NL0109 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $1,000 | n/a |
LE0592 # 06 Y:2025 | 06 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $12,213 | $24,000 | n/a |
LE0592 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,195 | $4,000 | n/a |
LE0592 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,361 | $3,915 | n/a |