IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,427

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0396 # 08 Y:2006 08 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,234 $1,702 Implemented
IA0396 # 09 Y:2006 09 2006 USE MINIMUM STEAM OPERATING PRESSURE $2,109 $25 Not Implemented
OK0735 # 01 Y:2006 01 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $69,788 $55,933 Not Implemented
OK0735 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,821 $9,500 Not Implemented
OK0735 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,625 $4,000 Not Implemented
OK0735 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,193 $12,830 Not Implemented
OK0735 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,240 $700 Not Implemented
LE0238 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,077,481 $2,403,050 Not Implemented
LE0238 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $902,617 $540,000 Not Implemented
LE0238 # 03 Y:2006 03 2006 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $335,810 $500 Implemented
LE0238 # 04 Y:2006 04 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $124,858 $17,600 Not Implemented
LE0238 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,103 $2,500 Implemented
LE0238 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,870 $3,000 Implemented
LE0238 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,609 $45,000 Implemented
LE0238 # 08 Y:2006 08 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,409 $3,000 Not Implemented
LE0238 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,223 $1,000 Not Implemented
LE0238 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,471 $2,500 Not Implemented
LE0238 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,065 $90 Implemented
UF0384 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,070 Not Implemented
UF0384 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $2,569 $2,053 Not Implemented
UF0384 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $117 $0 Not Implemented
UF0384 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,026 $0 Not Implemented
UF0384 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,822 $3,057 Not Implemented
UF0384 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,524 $408 Not Implemented
UF0384 # 07 Y:2006 07 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,857 $575 Not Implemented