Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0047 # 01 Y:2020 | 01 | 2020 | MINIMIZE WATER USAGE | $75,018 | $1,383 | Not Implemented |
NL0047 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $41,210 | $15,000 | Implemented |
NL0047 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,600 | $6,024 | Implemented |
NL0047 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,234 | $230 | Implemented |
NL0047 # 05 Y:2020 | 05 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $925 | $5,160 | Not Implemented |
NL0047 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $1,700 | Implemented |
NL0047 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $1,148 | Implemented |
GT0943 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $3,005 | $563 | Implemented |
GT0943 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $4,323 | $2,678 | Implemented |
GT0943 # 03 Y:2020 | 03 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $490 | $350 | Not Implemented |
GT0943 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,306 | $3,500 | Implemented |
GT0943 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $736 | $1,938 | Implemented |
GT0943 # 06 Y:2020 | 06 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $27,227 | $225,984 | Not Implemented |
UD1012 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,380 | $400 | Not Implemented |
UD1012 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,706 | $0 | Not Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1012 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,440 | $0 | Not Implemented |
UD1012 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,521 | $1,000 | Not Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1012 # 08 Y:2020 | 08 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $46,434 | $0 | Not Implemented |
UD1012 # 09 Y:2020 | 09 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,338 | $0 | Implemented |
UD1012 # 10 Y:2020 | 10 | 2020 | OPTIMIZE PLANT POWER FACTOR | $145,150 | $100,000 | Not Implemented |
UD1012 # 11 Y:2020 | 11 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $86,219 | $9,464 | Not Implemented |
UD1012 # 12 Y:2020 | 12 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $34,941 | $20,000 | Not Implemented |