matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0543 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $839 | $100 | Implemented |
LE0543 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $210 | $760 | Implemented |
LE0543 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,298 | $8,400 | Implemented |
LE0543 # 06 Y:2023 | 06 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,075 | $13,169 | Implemented |
LE0543 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,200 | $9,000 | Implemented |
LE0543 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,597 | $3,000 | Not Implemented |
SU0439 # 07 Y:2017 | 07 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,395 | $41,742 | Implemented |
SU0439 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $38 | $0 | Implemented |
SU0439 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $947 | $0 | Implemented |
SU0439 # 01 Y:2017 | 01 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,112 | $0 | Implemented |
SU0439 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $551 | $450 | Implemented |
SU0439 # 04 Y:2017 | 04 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $23 | $0 | Implemented |
SU0439 # 06 Y:2017 | 06 | 2017 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $98 | $342 | Implemented |
SU0356 # 08 Y:2014 | 08 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,264 | $951 | Not Implemented |
SU0356 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $637 | $472 | Not Implemented |
SU0356 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,768 | $1,900 | Not Implemented |
SU0356 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $577 | $715 | Not Implemented |
SU0356 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,282 | $3,539 | Not Implemented |
SU0356 # 04 Y:2014 | 04 | 2014 | ELIMINATE/REDUCE AN OPERATION | $3,970 | $2,341 | Not Implemented |
SU0356 # 03 Y:2014 | 03 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $128,704 | $104,500 | Not Implemented |
SU0356 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $609 | $0 | Not Implemented |
SU0356 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,526 | $0 | Not Implemented |
SU0282 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $751 | $635 | Implemented |
SU0282 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,409 | $513 | Implemented |
SU0282 # 04 Y:2009 | 04 | 2009 | USE SYNTHETIC LUBRICANT | $366 | $0 | Implemented |