IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0827 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,551 $1,487 Not Implemented
GT0827 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $2,328 Implemented
GT0827 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $4,053 Implemented
GT0827 # 04 Y:2006 04 2006 REDUCE EXCESS STEAM BLEEDING $10,400 $39,900 Not Implemented
GT0827 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $158,948 $150,000 Implemented
GT0827 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $325,944 $38,000 Not Implemented
GT0827 # 07 Y:2006 07 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,734 $3,500 Not Implemented
GT0827 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,887 $3,400 Implemented
GT0827 # 08 Y:2006 08 2006 METER WASTE WATER $81,583 $5,250 Implemented
GT0827 # 03 Y:2006 03 2006 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $85,490 $12,500 Not Implemented
OR0506 # 01 Y:2006 01 2006 ADD ADDITIONAL PRODUCTION SHIFT $360,000 $2,100 Implemented
OR0506 # 06 Y:2006 06 2006 PAY BILLS ON TIME TO AVOID LATE FEES $2,300 $0 Implemented
OR0506 # 02 Y:2006 02 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,000 $2,100 Implemented
OR0506 # 05 Y:2006 05 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $3,600 Implemented
OR0506 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Implemented
OR0506 # 04 Y:2006 04 2006 ADD ADDITIONAL PRODUCTION SHIFT $11,400 $2,700 Implemented
MS0303 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,224 $161,070 Implemented
MS0303 # 03 Y:2006 03 2006 BURN WASTE OIL FOR HEAT $3,804 $2,186 Implemented
MS0303 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,457 $1,500 Implemented
MS0303 # 02 Y:2006 02 2006 HEAT WATER WITH EXHAUST HEAT $9,180 $27,946 Not Implemented
IA0397 # 09 Y:2006 09 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,154 $2,500 Not Implemented
IA0397 # 08 Y:2006 08 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $6,601 $1,302 Not Implemented
IA0397 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,105 $3,000 Not Implemented
IA0397 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,632 $60 Not Implemented
IA0397 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,968 $71,321 Not Implemented