IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0072 # 09 Y:2011 09 2011 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,840 $2,500 Implemented
DL0072 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $6,125 Implemented
DL0072 # 11 Y:2011 11 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $26,800 $5,500 Not Implemented
DL0072 # 08 Y:2011 08 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,150 $13,000 Implemented
DL0072 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,009 $1,045 Not Implemented
DL0072 # 10 Y:2011 10 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,520 $65,000 Not Implemented
DL0072 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,600 $12,840 Not Implemented
DL0072 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,200 $34,175 Not Implemented
DL0072 # 05 Y:2011 05 2011 REDESIGN PROCESS $50,600 $5,000 Not Implemented
DL0072 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $44,400 $2,000 Not Implemented
DL0072 # 03 Y:2011 03 2011 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,600 $5,000 Not Implemented
DL0072 # 02 Y:2011 02 2011 OPERATE BOILERS ON HIGH FIRE SETTING $136,800 $100,000 Not Implemented
DL0072 # 12 Y:2011 12 2011 REDUCE VENTILATION AIR $44,740 $4,400 Implemented
DL0072 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $282,000 $500,000 Not Implemented
OK0811 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $32,372 $270,346 Not Implemented
OK0811 # 10 Y:2011 10 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $22,682 $0 Implemented
OK0811 # 09 Y:2011 09 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $61,620 $459 Not Implemented
OK0811 # 08 Y:2011 08 2011 MINIMIZE WATER USAGE $159,930 $46,397 Not Implemented
OK0811 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $160 $944 Implemented
OK0811 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,716 $11,429 Not Implemented
OK0811 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,132 $60,156 Not Implemented
OK0811 # 03 Y:2011 03 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,854 $2,600 Implemented
OK0811 # 02 Y:2011 02 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,432 $60,934 Not Implemented
OK0811 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $127,513 $58,126 Not Implemented
GT0880 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $70,097 $17,000 Implemented