Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 311612 | Meat Processed from Carcasses |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0396 # 09 Y:2006 | 09 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $2,109 | $25 | Not Implemented |
IA0396 # 08 Y:2006 | 08 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,234 | $1,702 | Implemented |
IA0396 # 07 Y:2006 | 07 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $6,338 | $500 | Implemented |
IA0396 # 06 Y:2006 | 06 | 2006 | HEAT WATER WITH EXHAUST HEAT | $57,298 | $18,000 | Not Implemented |
IA0396 # 05 Y:2006 | 05 | 2006 | DISCONNECT BALLASTS | $810 | $83 | Implemented |
IA0396 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,836 | $4,661 | Implemented |
IA0396 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $302 | $3,899 | Implemented |
IA0396 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,228 | $600 | Implemented |
IA0396 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $781 | $25 | Not Implemented |
OK0735 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,240 | $700 | Not Implemented |
OK0735 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,193 | $12,830 | Not Implemented |
OK0735 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,625 | $4,000 | Not Implemented |
OK0735 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,821 | $9,500 | Not Implemented |
OK0735 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $69,788 | $55,933 | Not Implemented |
AM0507 # 02 Y:2006 | 02 | 2006 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $37,900 | $600 | Implemented |
AM0507 # 11 Y:2006 | 11 | 2006 | USE PHOTOCELL CONTROLS | $1,120 | $100 | Implemented |
AM0507 # 01 Y:2006 | 01 | 2006 | COMBINE UTILITY METERS | $71,000 | $100,000 | Implemented |
AM0507 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,000 | $51,000 | Not Implemented |
AM0507 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $13,750 | $2,100 | Implemented |
AM0507 # 05 Y:2006 | 05 | 2006 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $7,616 | $25,000 | Not Implemented |
AM0507 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,000 | $500 | Implemented |
AM0507 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,240 | $400 | Implemented |
AM0507 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,900 | $9,900 | Implemented |
AM0507 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,430 | $1,620 | Implemented |
AM0507 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $733 | $0 | Implemented |