IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 311612 Meat Processed from Carcasses
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1007 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,235 $23,550 Implemented
UD1007 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,710 $34,800 Not Implemented
UD1007 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $1,000 Not Implemented
UD1007 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,204 $0 Implemented
UD1007 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,535 $500 Not Implemented
UD1007 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,566 $4,400 Not Implemented
UD1007 # 05 Y:2019 05 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,980 $0 Implemented
UD1007 # 04 Y:2019 04 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $80,784 $10,000 Not Implemented
UD1007 # 03 Y:2019 03 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $87,749 $5,000 Not Implemented
UD1007 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $924 $0 Not Implemented
UD1007 # 01 Y:2019 01 2019 DEVELOP A REPAIR/REPLACE POLICY $21,932 $0 Not Implemented
OK1020 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,410 $1,270 Not Implemented
OK1020 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,990 $0 Not Implemented
OK1020 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,536 $500 Not Implemented
OK1020 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,978 $73,560 Not Implemented
OK1020 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $111,877 $100,000 Not Implemented
OK1020 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $91,270 $50,570 Not Implemented
OK1020 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $164,531 $0 Not Implemented
NC0639 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,819 $1,000 Not Implemented
NC0639 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $103,705 $500 Not Implemented
NC0639 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,235 $31,057 Not Implemented
NC0639 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,727 $25,000 Not Implemented
NC0639 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $49,700 $125,000 Not Implemented
NC0639 # 02 Y:2019 02 2019 INCREASE AMOUNT OF CONDENSATE RETURNED $4,196 $8,200 Not Implemented